Cenovus
Contract OCT E/I Commissioning/Planner Leads
Christina Lake, AB · Onsite
POSTED
6/16/2026
Job Description
Reporting to the Sr. Coordinator, the Contract E/I Commissioning Lead / Planner Role is responsible for Commissioning & Planning strategy as it relates to instrumentation, controls, and electrical (ICE) scope. The E/I Commissioning Planning Role ensures work packages are executed as designed and compliant with codes, standards, and specifications.
Rotation Details:
• Travel days: Coordinated through designated flight or bus hubs depending on site assignment
• Core workdays: Defined by operational shift rotation schedule
• Night shift details: May be required depending on assigned rotation and site needs
Assignment Details:
• Work Type: Fly-In/Fly-Out or bus-in camp-based assignment depending on site
• Accommodation: Full-service camp facilities provided at all locations
• Transportation: Provided from designated hubs (Calgary, Edmonton, La Corey, Lac La Biche depending on site)
• Deviation Clause: Assignment location and rotation may vary based on operational demand across oil sands sites
Position Summary
Role is responsible for Commissioning & Planning strategy as it relates to instrumentation, controls, and electrical (ICE) scope. The E/I Commissioning Planning Role ensures work packages are executed as designed and compliant with codes, standards, and specifications.
Key Responsibilities
• Prepare detailed work order job plans to support maintenance execution
• Receive and review work notifications, prioritize tasks, and select work based on urgency and schedule requirements
• Develop complete work packages including materials, labour, tools, external services, and cost estimates
• Coordinate required trades, materials, and equipment to support effective job execution
• Support adherence to the work order lifecycle process
• Collaborate with maintenance, operations, and engineering teams to align planning activities
• Support planning for shutdowns, turnarounds, and outage events
• Track and support performance against KPIs such as backlog, readiness, capacity utilization, and maintenance costs
• Ensure compliance with site procedures, workflows, and standard practices
• Apply knowledge of safe work practices and planning requirements in all activities
Accountabilities
• Accountable for accuracy and completeness of maintenance plans and work packages
• Accountable for aligning planning activities with operational priorities and schedules
• Responsible for ensuring planned work supports safe execution and efficient resource utilization
• Required to follow all site processes, safety procedures, and Cenovus standards
Qualifications
Must-Have:
• Extensive experience using Computerized Maintenance Management Systems (CMMS)
• Demonstrated commitment to safety standards
• Legal authorization to work in Canada
Assets:
• Experience with Management of Change (MOC) processes
• Experience with turnaround and asset management processes
• Experience using SAP
Skills & Competencies
• Strong planning and organizational skills
• Ability to prioritize and manage multiple tasks under changing conditions
• Effective coordination and communication across multiple functional groups
• Strong understanding of maintenance workflows and lifecycle processes
• Analytical approach to resource planning and cost optimization
• Attention to detail in developing work packages and documentation
Safety & Compliance
• Required to follow all site safety procedures, policies, and regulatory requirements
• Applies critical safe work practices in all planning activities
• Ensures all work plans incorporate appropriate safety controls and hazard mitigation measures
• Supports a culture of safety by aligning planning activities with safe execution standards
• Complies with Cenovus operational standards and procedures at all assigned locations
Qualifications
Education/Certifications
Ready to apply?
You'll complete the application through our portal.
About Cenovus
We’re a Canadian-based integrated energy company headquartered in Calgary. We’re committed to maximizing value by developing our assets in a safe, responsible and cost-efficient manner, integrating sustainability considerations into our business plans.
We operate in Canada, the United States and the Asia Pacific region. Our operations include oil sands projects in northern Alberta, thermal and conventional crude oil and natural gas projects across Western Canada, crude oil production offshore Newfoundland and Labrador and natural gas and liquids production offshore China and Indonesia. Cenovus’s downstream operations include upgrading, refining and marketing operations in Canada and the United States.
Our shares trade under the symbol CVE and are listed on the Toronto and New York stock exchanges.
Role summary
Contract OCT E/I Commissioning/Planner Leads
Christina Lake, AB · Onsite
TYPE
Contract · 12 Months
STARTS
7/6/2026
POSTED
June 16, 2026
Not quite the right fit?
Browse all of our open roles across tech, finance, and engineering.
See all jobs →Looking for something specific?
Create a profile and get jobs recommended to you based on your skills and preferences.
Create a profile →